General Details
Administrative Sanction Order Number Dated Amount(crores)
GO(Rt)No.718/2018/PWD 19.04.2018 22.51
District Kozhikode
LAC Kozhikode North
Location
Project Details
Actual Start Date 19.04.2018
Project Management Consultant ISA
Category Road Over Bridges
LC No 190
Railway (km) 670/000-100
Length Including Approaches 468 m
Width of ROB 10.2 m
GAD Status Not Approved
No of Lanes 2
Financial Details
AS Amount(crores) 22.51
Funded By KIIFB
Project Outlay(crores) 37.83
Work Progress Details
Physical progress 75 %
Current status DPR approved by KIIFB on 07.02.2020 for an amount of Rs.37.83 Cr. Project was pending due to Semi High Speed Rail project of KRDCL. On 06.12.2022, KRDCL had informed to go ahead with the construction of ROBs without considering the silver line alignment and RBDCK intimated the same to Railways on 08.12.2022. Railways directed to submit revised GAD for all ROBs long pending due to Silver line vide letter dated 14.03.2023. Appointed the Consultancy M/s JH for the revision of GAD and alignment on 17.03.2023. LUS inspection conducted on 04.07.2023 and report received. Revised GAD submitted on 18.08.2023. Returned for correction on 18.10.2023. Revised GAD submitted on 27.02.2024. The Railways had informed that all the future ROB superstructures are to be designed for Special Vehicle Loading. RBDCK had already requested for RDSO drawings vide letters dated 14.03.2024 and 06.05.2024. As per the above direction, all the pending GADs can be submitted only after the receipt of the RDSO drawings for Special Vehicle Loading.