Projects

Kokkalai & East Fort Flyover

Back

General Details
Administrative Sanction Order Number Dated Amount(crores)
GO(Rt)No.1324/2016/PWD 27.09.2016 75
District Thrissur
LAC Thrissur
Project Details
Actual Start Date 27.09.2016
Project Management Consultant KITCO Ltd
Category Flyover
Length including approaches NOT FINALISED
Width of Flyover NOT FINALISED
No of Lanes NOT FINALISED
Financial Details
AS Amount(crores) 75
Funded By KIIFB
Work Progress Details
Physical progress 40 %
Current status Kokkalai Flyover: The alignment falls in the 3rd line of Indian Railway between Ernakulam to Shornur. Vide letter dated 11.07.2022, Railway informed that the GAD of ROB’s between Ernakulam and Shornur will be approved only after finalization of 3rd line. Kizhakkekotta Flyover: 3 alignment options prepared and submitted to Thrissur Corporation for finalizing the alignment as the location is a heavily built-up area and several buildings will be affected. A meeting with Thrissur corporation was held on 17.03.2022 and 26.03.2022. They requested some modifications in the alignment options. Modified alignment submitted to Thrissur Corporation on 04.04.2022. Reminder letter send on 23.06.2022. Again a meeting with Thrissur mayor was conducted on 26.07.2022 to finalise the alignment. Awaiting approval from Thrissur Corporation. During the CMT meeting convened on 29.04.2023, it was directed to submit a detailed report to the Convener, DICC. The same was submitted on 16.05.2023. Reminder letter to Trissur Corporation submitted on 23.09.2023. RBDCK has given instruction to the DPR consultant for preparing the DPR. The consultants had submitted the draft DPR. The draft DPR has been returned to the consultants for incorporating some corrections.