ACADEMIC BLOCK |
|
|
1 |
Columns & Retaining wall (A &B)- Centering and shuttering |
47.6 m2 |
|
2 |
Columns, Beam, Slab - Steel Reinforcement |
9950 kg |
|
3 |
Concrete - Retaining wall & Columns Zone B & Zone A |
13.68 m3 |
|
|
INTERNATIONAL GUEST HOUSE |
|
|
4 |
Beam and Slab - Centering and shuttering |
289 m2 |
|
|
ENGINEERING BLOCK |
|
|
5 |
Columns - Steel Reinforcement |
1550 kg |
|
6 |
Column - Centering and shuttering |
39.5 m2 |
|
7 |
Columns Concrete 1st floor |
4.9 m2 |
|
|
CAMPUS REJUVENATION |
|
|
8 |
Earthwork Excavation |
27 m3 |
|
9 |
Drain PCC |
Lumpsome |
|
10 |
Drain RCC |
4.20 m3 |
|
11 |
Reinforcement |
800 kg |
|