ACADEMIC BUILDING |
|
|
1 |
Centering and shuttering @ Column @ Zone A & B , Beam and Slab @+5.10 lvl |
52 sqm |
|
2 |
Steel Reinforcement @ Zone A & B Columns in GF , Beam and Slab @ +5.10 lvl |
1150 kg |
|
3 |
RCC –M30 @ Columns Zone B & Zone A, Zone B Lintel Beam. |
|
|
|
INTERNATIONAL GUEST HOUSE |
|
|
4 |
RCC M30 @ Beam and Slab @ +3.30 lvl |
95.50 cum |
|
5 |
Steel Reinforcement @ Stair 1&2 |
335 kg |
|
6 |
Centering and shuttering @ Stair 1&2 |
26 sqm |
|
|
ENGINEERING DEPARTMENT BLOCK |
|
|
7 |
Centering and shuttering @ Beam and Slab @ +6.30 lvl |
140 sqm |
|
8 |
Steel Reinforcement @ Beam and Slab @ +6.30 lvl |
2800 kg |
|
|
CAMPUS REJUVENATION |
|
|
9 |
Centering and Shuttering @ Location 3-4 and1-2 |
90.50 sqm |
|
10 |
Steel Reinforcement @ Location 3-4 and1-2 |
2550 kg |
|
11 |
Drain RCC @ Location 3-4 and1-2 |
22 cum |
|