08.02.2021 - 14.02.2021
View previous reports View Project
Weekly Progress From 08.02.2021 - 14.02.2021
Sl No Item Description Executed Quantity Remarks
ACADEMIC BUILDING
1 Steel Reinforcement (kg) 850 kg Column at 6.30 level
2 RCC –M30(cum) 54 cum RCC –M30(cum)
INTERNATIONAL GUEST HOUSE
1 Centering and shuttering (sqm) 80 sqm Beam and Slab @ +3.30 lvl
2 Steel Reinforcement (kg) 700 kg Beam and Slab @ +3.30 lvl
ENGINEERING DEPARTMENT BLOCK
1 Centering and shuttering (sqm) 52 sqm Beam and Slab @ +6.30 lvl
2 Steel Reinforcement (kg) 600 kg Beam and Slab @ +6.30 lvl
CAMPUS REJUVENATION
1 Centering and Shuttering (sqm) 120 sqm Location 5-6 and1-2
2 Steel Reinforcement (kg) 1000 kg Location 3-4 and 5-6
3 Drain RCC (cum) 25.90 cum Location 3-4 and1-2