Weekly Progress From 15.02.2021 - 21.02.2021
Sl No Item Description Executed Quantity Remarks
ACADEMIC BUILDING
1 Steel Reinforcement (kg) 200.00 kg Column at 6.30 level
INTERNATIONAL GUEST HOUSE
1 Centering and shuttering (sqm) 85.00 sqm Beam and Slab @ +3.30 lvl
2 Steel Reinforcement (kg) 200.00 kg Beam and Slab @ +3.30 lvl
3 RCC –M30(cum) 42.00 cum Beam and Slab @ +3.30 lvl
ENGINEERING DEPARTMENT BLOCK
1 Centering and shuttering (sqm) 50.00 sqm Beam and Slab @ +6.30 lvl
2 Steel Reinforcement (kg) 850.00 kg Beam and Slab @ +6.30 lvl
CAMPUS REJUVENATION
1 Centering and Shuttering (sqm) 120.00 sqm Location 5-6 and1-2
2 Steel Reinforcement (kg) 850.00 kg Location 3-4 and 5-6
3 Drain RCC (cum) 9.50 cum Location 3-4 and1-2