Projects

22.02.2021 - 28.02.2021
View previous reports View Project
Weekly Progress From 22.02.2021 - 28.02.2021
Sl No Item Description Executed Quantity Remarks
ENGINEERING DEPARTMENT BLOCK
1 RCC –M30(cum) 106 cum Beam and Slab @ +6.10 LVL
CAMPUS REJUVENATION
1 Centering and Shuttering (sqm) 120 sqm Location 3-4 & Location 6 to existing drain
2 Steel Reinforcement (kg) 200 kg Location 3-4 & Location 6 to existing drain
3 Drain RCC (cum) 11 cum Location 3-4 & Location 6 to existing drain

Images

View previous reports View Project