Weekly Progress From 01.03.2021 - 07.03.2021 | ||||
---|---|---|---|---|
Sl No | Item Description | Executed Quantity | Remarks | |
CAMPUS REJUVENATION | ||||
1 | Centering and Shuttering (sqm) | 102 sqm | Location 3-4 & Location 6 to existing drain | |
2 | Steel Reinforcement (kg) | 80 kg | Location 3-4 & Location 6 to existing drain | |
3 | Drain RCC (cum) | 9 cum | Location 3-4 & Location 6 to existing drain |