Weekly Progress From 01.03.2021 - 07.03.2021
Sl No Item Description Executed Quantity Remarks
CAMPUS REJUVENATION
1 Centering and Shuttering (sqm) 102 sqm Location 3-4 & Location 6 to existing drain
2 Steel Reinforcement (kg) 80 kg Location 3-4 & Location 6 to existing drain
3 Drain RCC (cum) 9 cum Location 3-4 & Location 6 to existing drain